East Midlands Health Trust
East Midlands Health Trust had identified a
potential major slip issue with one of the vinyl floors in their senior care
department. If left untreated, this could have led to serious slip injuries to
patients and staff, and therefore needed to be resolved as a matter of urgency.
Contract Maintenance Group identified
Maxiflex as the best product for the problem. Applied in a similar way to
traditional floor treatments, each coat of Maxiflex took only 15 minutes to dry
making it incredibly quick and efficient.
‘The results of the treatment have been
excellent,’ explained a spokesperson for the Trust, ‘the job was carried out
with extreme care, given the sensitivity of the area, and the slip resistance
has been greatly improved.
And because the aesthetics of the floor has
not changed, the feedback from our cleaning services team has been extremely
positive too.’
Maintenance of Maxiflex is also very
efficient. Heavy traffic lanes can easily be re-coated without having to
retreat the whole floor, and stripping is only required approximately every three
years.
|